London Road Closures

london-road-closures

Posted on 03-Sep-2020

Knightsbridge 

Road closures till late November 2020

There will be restrictions on lanes and temporary lights on A4. At the junction with Sloane Street and Brampton Road, and works to be carried out by Cadent Gas. Delays are expected, please plan ahead.


Vauxhall Bridge  Closure until late November 2020. 

Because of Critic repairs, Vauxhall Bridge will be shut to general traffic in both directions. For the time being, access will be kept up in the two bearings for people on foot, cyclists, and southward transports, Buses, and cabs.


Transports and coaches heading northward towards Victoria will be on a redirection utilizing Lambeth Bridge and Millbank. Vehicles using the marked redirection course will be absolved from the Congestion Charge, and Ultra Low Emission Zone charges. 


A10 Bishopgate corridor changes to road format and traffic rules. 


Changes are made to the Liverpool Street Station lanes, along the A10 Bishopsgate passage and up to Shoreditch Highstreet Station as far as possible.  Changes include presenting transportation and cycling just accessing certain avenues from Monday to Friday 7 am-7 pm and empowering explorers to walk, cycle, and use open vehicles while maintaining a protected social distance. 


 Try an elective course to keep a strategic distance from the deferrals to your excursion. If you didn't keep a strategic distance from the territory, it would be ideal if you stay on Inner Ring Road, if possible, as opposed to neighbourhood boulevards. 


Paddington, Edgware Road - Continuous issue. 


Please be aware that PCNs are being provided at the intersection with Harrow Road in Paddington, Edgware Lane, where drivers are over-ranked, and the pedestrian crossing blocked. This place has already been marked for upgrades under the Safer Junctions project, and further progress will begin later this year. 


London Bridge essential support works 


The City of London performs critical repair work at London Bridge. 


As part of the TLRN, the path across London Bridge, the A3, is managed by TfL and we collaborate with the City of London to monitor the effect of these works on our network. At this time London Bridge will be closed to all traffic in both directions excluding buses, registered taxis and cyclists.


Oxford Street Until December 2020


Oxford Street will have multiple closures in all directions between Marble Arch and Tottenham Court Road from 22:00 to 06:00 every Sunday and Monday night until December 2020. Oxford Street will be closed on Sunday nights between Oxford Circus and Tottenham Court Road. between Oxford Circus and Marble Arch Oxford Street will be closed. 

Post a Comment

© IMPERIAL RIDE LTD.

Imperial Ride Limited. Registered in England & Wales, Company Registration Number 09073365. All Rights Reserved.